Continuum Build

Capital project management
built for health system owners.

Not adapted from a general contractor's workflow. Not a configure-first platform that requires months of professional services. Built specifically for how healthcare PDC teams plan, approve, and deliver capital projects.

$172M
Demonstration portfolio — budget, Gantt, governance, cash flow all live
Day 1
Healthcare governance tiers available — not after months of configuration
Zero
Manual re-entry when a project promotes from Plan to Build

Why It Exists

The existing tools were built for
the wrong buyer.

Contractor-focused PM platforms were designed for general contractors managing their own projects. Configure-first IWMS platforms require months of professional services before they work. Neither was built for the health system owner managing a portfolio of capital projects from the other side of the table.

Capability
Contractor PM
Configure-First
Continuum Build
Owner-side portfolio governance
Limited
Native
Native
Healthcare approval tiers, pre-built
No
Configure
Built in
Schedule-to-cash flow auto-link
No
No
Yes
Native interactive CPM Gantt
Limited
In development
Live
ICRA/PCRA compliance tracking
No
No
Built in
Healthcare closeout checklist
Generic
No
22-item standard
Front-end space planning integration
No
No
Native
Ready for healthcare workflows day one
No
No
Yes

What It Does

Seven modules. One platform.
All healthcare-specific.

01 — Governance

Five-tier approval workflow. Pre-built. Not configured.

Amount-based governance tiers resolve automatically — when a project's projected cost crosses a threshold, the appropriate approval tier triggers without anyone having to remember the rules. Submit, review, approve, or reject with notes. The approval history is a permanent audit trail. Cost overruns that push a project into a higher tier trigger an automatic alert before anyone is surprised.

Capital Approval · $12.5M Project
Tier 1 · Dept Director✓ Approved
Tier 2 · VP of PDC✓ Approved
Tier 3 · CFO⏳ Pending
Tier 4 · Board— Not yet

02 — Cash Flow

Schedule-anchored. When dates shift, forecasts update.

Cash flow is modeled against the project schedule — not as a separate spreadsheet that goes stale the moment a milestone moves. Six distribution curve shapes (linear, S-curve, front-loaded, back-loaded, bell curve). Actual spend entries lock the corresponding period. The remaining forecast redistributes automatically across unlocked months.

Cash Flow · S-Curve · $12.5M Budget
Total budget$12.5M
Total projected$12.5M
Actual to date$50K
Jan locked · remaining redistributedAuto

03 — Gantt Schedule

Critical path. Seeded from the space program.

The Build Gantt starts from Plan's phase schedule — phase items become the top-level milestone tasks, pre-dated from the project's target start date. Add sub-tasks, dependencies, and assignments. The CPM engine runs on every edit and highlights the critical path. Milestones, dependencies (FS, SS, FF, SF), progress tracking, and baseline compare are all included.

Gantt · 7 Tasks · Critical Path Active
ProgrammingCritical · ✓ Complete
Schematic DesignCritical · 25%
Design DevelopmentNot started
Float on critical path0 days

04 — ICRA/PCRA

Infection control compliance. FGI matrix built in.

Enter construction type and patient risk group. The ICRA class is suggested automatically from the CDC/FGI matrix. Required precautions populate by class. Track assessment status, effective dates, and review signatures — all in the project record.

05 — Documents

Drawing management, RFIs, submittals, and more.

Upload drawings with sheet numbers, disciplines, and issuance dates. Filter by type — drawings, specs, contracts, submittals, photos. Signed URLs for secure access. Version tracking. All stored in a private Supabase Storage bucket, scoped to your org.

06 — Closeout

22-item healthcare closeout checklist. Pre-populated.

Substantial completion, documentation, systems commissioning, regulatory, financial reconciliation, and activation — all in one checklist. Assign items, track completion, add custom items for your system's requirements. When everything is resolved, advance the project to Completed.


07 — Embedded AI Agents

Every module above is watched. Continuously.

Five agents run in the background across Cash Flow, Budget, Schedule, Contracts, and Governance — Cash Flow Intel, Budget Sentinel, Schedule Watchdog, Contract Guardian, and Governance Patrol. Each one flags its own kind of risk automatically: forecast overruns, contingency burn, eroding critical-path float, stalled NTPs and change orders, quiet gate approvals. A general assistant sits on top of all of it, answering questions about any project from anywhere in the platform.

Open Findings · Emergency Dept Renovation
Budget SentinelContingency down to 18%
Schedule Watchdog3 days of float remaining
Contract GuardianNTP overdue — Acme Mechanical
Governance PatrolGate approval pending 22 days

The Handoff

Build starts where
Plan leaves off.

When a project moves from planning to execution, one click promotes the Plan data to Build — atomically, in a single database transaction.

→ Plan's cost estimate becomes the Build budget baseline. Budget amount is locked — preserving the original scope commitment.
→ Plan's phase schedule becomes the Build Gantt's top-level milestones. Pre-dated from the project start date.
→ Plan's room program becomes the scope baseline. Every project task can be traced back to a room.

No other platform can offer this handoff — because no other platform owns both sides. This is Continuum's defining differentiator.

From Continuum Plan

54-room space program
$10.3M cost estimate
18-month phase schedule
→ Promote to Execution →

Into Continuum Build

$10.3M project budget (locked baseline)
7-task Gantt seeded from phases
Scope baseline from room program

See Continuum Build Live

A $172M portfolio.
Every module working.

30 minutes. Live governance, live Gantt, live cash flow. Real data.

What you'll see

$172M demonstration portfolio — governance approvals in progress, cash flow S-curve with actuals entered, CPM Gantt with critical path highlighted, ICRA assessments, and a project closeout in progress.

The handoff live

You'll see a project promoted from Plan to Build in real time — space program → budget seeded → Gantt seeded. The feature no competing platform can demonstrate.