Strategic Planning
to Project Closeout.

Continuum is one connected system for space programming, cost estimating, capital project management, governance, and closeout. You enter a department and its size, and that same data carries through planning, design, and construction. Nothing gets re-entered or reconciled by hand.

Zero
Manual re-entry from the first room count to closeout
One Platform
Programming, estimating, and governance in one system instead of three stitched together
Full Lifecycle
Planning through closeout, tracked in one continuous system

The Difference

What a capital project looks like
before and after Continuum.

Without Continuum

✕ Open a blank spreadsheet and start from scratch, again.
✕ Pull up the FGI Guidelines PDF. Look up each room type manually.
✕ Build a cost estimate in a separate tool. It won't match the program.
✕ Write a schedule in a third tool. It won't match either.
✕ Track governance and approvals in email and spreadsheets.
✕ Re-enter everything again when the project moves into execution.

Weeks of manual work. Every project. Every time.

With Continuum

✓ Select department type and key input (bays, beds, ORs).
✓ Click Generate. The full room list appears, sized and checked against FGI.
✓ Cost estimate and phase schedule built automatically from the program.
✓ Move the project into execution. The Gantt, budget, and approvals are already set up.
✓ Track cash flow, ICRA/PCRA, and approvals through to closeout.
✓ One record, start to finish. Nothing re-entered.

Under an hour to program. One system through closeout.

Why It Exists

The existing tools were built for
the wrong buyer.

Contractor PM platforms were designed for general contractors managing their own work. IWMS platforms need months of consulting before they're usable. Generic space planners don't know what a hospital room is. None of them were built for the health system owner managing a whole portfolio of projects.

Capability
Contractor PM
Configure-First
Continuum
Parametric, FGI-compliant space programming
No
No
Native
Owner-side portfolio governance
Limited
Native
Native
Healthcare approval tiers, pre-built
No
Configure
Built in
Schedule-to-cash flow auto-link
No
No
Yes
Native interactive CPM Gantt
Limited
In development
Live
ICRA/PCRA compliance tracking
No
No
Built in
Healthcare closeout checklist
Generic
No
22-item standard
Planning-to-execution continuity, no re-entry
No
No
Native
Ready for healthcare workflows day one
No
No
Yes

What It Does

Thirteen capabilities.
One continuous system.

The first six cover planning, before a project is even approved. The rest carry that same data through design, construction, and closeout.

Planning

01 — Space Programming

Room lists generated from one number, checked against FGI.

Enter one key number (treatment bays, licensed beds, or operating rooms) and Continuum generates the full room list for the department. Room types, quantities, square footage, and gross factors come from the FGI Guidelines and your own planning standards. If a room falls below the minimum, it gets flagged right away.

Covers 55+ department types: ED, ICU, med-surg, imaging, pharmacy, OR suite, behavioral health, and more.

ED Expansion · 25 treatment bays
Rooms generated54
Departments4
Total net SF14,200
Total gross SF18,460
FGI compliance flags0 critical
Time to generate< 1 min

02 — Cost Estimating

Uniformat II cost estimates built from the program.

The estimate comes straight from the room program, using the same quantities, unit costs, and line items. You can keep versions to see how costs change from conceptual through construction documents. Mark one as the budget seed and it becomes the project budget when the project moves into execution.

Your own cost history (cost per SF, soft cost percentages, contingency) replaces the national defaults, so estimates reflect what your projects actually cost.

Conceptual Estimate · SD Phase
Construction cost$8.1M
FF&E$820K
Soft costs (15%)$1.2M
Contingency (10%)$810K
Total project cost$10.3M

03 — Equipment Planning

Equipment lists and costs for every room.

Equipment lists are generated room by room from your planning standards, using your GPO contract items, standard quantities, and unit costs. The Equipment tab groups everything by department, with subtotals and a grand total that feeds the FF&E line of the estimate.

Treatment Room · Standard Equipment
Exam table1 · $4,200
Vitals monitor1 · $3,800
Nurse server1 · $1,200
Wall-mount supply1 · $680
Room total × 25$247,500

04 — Phase Scheduling

A project schedule generated from the program.

The phase schedule is generated from the scope and covers programming, schematic design, design development, construction documents, bidding, construction, and activation, with durations based on the size and complexity of the program. Mark one schedule as the seed and its phases become the top-level milestones in the execution Gantt.

Phase Schedule · ED Expansion
Programming4 wks
Schematic Design8 wks
Design Development10 wks
Construction Docs12 wks
Construction52 wks · 18 mo total

05 — Block Planning

A first floor plan, straight from the program.

The block plan engine lays rooms out on a floor plate using healthcare corridor patterns and adjacency rules. You can drag rooms around and export the layout as a PNG or DXF for early design conversations, even before an architect is on board.

06 — Export to Revit

A Revit-ready file for the design team.

Export your space program as an IFC4 file that opens directly in Revit. The design team gets room data, square footages, and department structure as a working model instead of a PDF they have to retype.


Execution & Governance

07 — Governance

Five-level capital approvals, already set up.

Approval levels are set by project cost. When a project's projected cost crosses a threshold, the right approval level kicks in automatically, so nobody has to remember the rules. Reviewers approve or reject with notes, and every decision stays on record. If a cost overrun pushes a project into a higher approval level, Continuum sends an alert right away.

Capital Approval · $12.5M Project
Tier 1 · Dept Director✓ Approved
Tier 2 · VP of PDC✓ Approved
Tier 3 · CFO⏳ Pending
Tier 4 · Board— Not yet

08 — Cash Flow

Cash flow that moves when the schedule moves.

Cash flow is modeled against the project schedule, so it doesn't go stale every time a milestone moves. You can pick a distribution curve (linear, S-curve, front-loaded, back-loaded, or bell curve). Entering actual spending locks that month, and the remaining forecast spreads across the open months automatically.

Cash Flow · S-Curve · $12.5M Budget
Total budget$12.5M
Total projected$12.5M
Actual to date$50K
Jan locked · remaining redistributedAuto

09 — Gantt Schedule

A critical-path Gantt that starts from the space program.

The execution Gantt starts from the phase schedule built during planning. Each phase becomes a top-level milestone, dated from the project's target start. From there you add sub-tasks, dependencies, and assignments, and the critical path recalculates with every edit. Milestones, all four dependency types (FS, SS, FF, SF), progress tracking, and baseline comparison are included.

Gantt · 7 Tasks · Critical Path Active
ProgrammingCritical · ✓ Complete
Schematic DesignCritical · 25%
Design DevelopmentNot started
Float on critical path0 days

10 — ICRA/PCRA

ICRA classes from the FGI matrix, tracked with the project.

Enter the construction type and patient risk group, and Continuum suggests the ICRA class from the CDC/FGI matrix and fills in the required precautions. Assessment status, effective dates, and sign-offs are all kept in the project record.

11 — Documents

Drawing management, RFIs, submittals, and more.

Upload drawings with sheet numbers, disciplines, and issue dates, and filter by drawings, specs, contracts, submittals, or photos. Files are versioned, kept in private storage that only your organization can reach, and shared through secure, expiring links.

12 — Closeout

A 22-item healthcare closeout checklist, ready to use.

Substantial completion, documentation, commissioning, regulatory, financial reconciliation, and activation, all in one checklist. Assign items, track progress, and add your own. When everything's done, mark the project complete.


13 — Embedded AI Agents

Agents keeping an eye on all of it.

Five agents run in the background: Cash Flow Intel, Budget Sentinel, Schedule Watchdog, Contract Guardian, and Governance Patrol. Each one watches for its own kind of risk, like forecast overruns, contingency burn, shrinking float on the critical path, stalled NTPs and change orders, or approvals that have gone quiet. A general assistant sits on top and can answer questions about any project from anywhere in the platform.

Open Findings · Emergency Dept Renovation
Budget SentinelContingency down to 18%
Schedule Watchdog3 days of float remaining
Contract GuardianNTP overdue · Acme Mechanical
Governance PatrolGate approval pending 22 days

Configurable Planning Standards

Standards that match how
your system builds.

Continuum uses three layers of standards. FGI minimums are the floor. Your organization's planning standards sit on top of those, and project-specific overrides sit on top of that.

By the time your system builds its fourth ED, what you learned on the first three is already in your Layer 2 standards: room ratios, target square footages, gross factors, and cost per SF from your actual bids. Each project starts from a better place than the last.

See how standards work →

Layer 1 — FGI Minimums

Locked. Code minimums that can never be programmed below. Updated with each FGI edition.

Layer 2 — Org Standards

Your organization's preferred room sizes, ratios, gross factors, and cost history. Set once. Applied to every project.

Layer 3 — Project Overrides

Deviations from org standards for this specific project. Flagged visually so planners always know what's non-standard.

No Re-Entry, Ever

One record, from
approval to closeout.

When a project moves from planning into execution, everything carries over in one step. Nothing gets rebuilt in another tool.

→ The cost estimate becomes the execution budget baseline, locked so the original scope commitment is preserved.
→ The phase schedule becomes the Gantt's top-level milestones. Pre-dated from the project start date.
→ The room program becomes the scope baseline. Every project task can be traced back to a room.

This only works because planning and execution live in the same system. Most tools only cover one or the other.

From Planning

54-room space program
$10.3M cost estimate
18-month phase schedule
→ Promote to Execution →

Into Execution

$10.3M project budget (locked baseline)
7-task Gantt seeded from phases
Scope baseline from room program

See Continuum Live

A guided walkthrough.
Every capability explained.

30 minutes, walked through step by step. Real data, not a canned demo.

What you'll see

We'll go through the platform one phase at a time (space programming, then cost estimating, then execution and governance) so you see how each piece works without getting a wall of screens all at once.

The continuity, live

You'll see a project move from planning into execution in real time, with the space program feeding the budget and the Gantt. Nothing gets re-entered.