Continuum is one connected system for space programming, cost estimating, capital project management, governance, and closeout. You enter a department and its size, and that same data carries through planning, design, and construction. Nothing gets re-entered or reconciled by hand.
The Difference
Without Continuum
Weeks of manual work. Every project. Every time.
With Continuum
Under an hour to program. One system through closeout.
Why It Exists
Contractor PM platforms were designed for general contractors managing their own work. IWMS platforms need months of consulting before they're usable. Generic space planners don't know what a hospital room is. None of them were built for the health system owner managing a whole portfolio of projects.
What It Does
The first six cover planning, before a project is even approved. The rest carry that same data through design, construction, and closeout.
Planning
01 — Space Programming
Enter one key number (treatment bays, licensed beds, or operating rooms) and Continuum generates the full room list for the department. Room types, quantities, square footage, and gross factors come from the FGI Guidelines and your own planning standards. If a room falls below the minimum, it gets flagged right away.
Covers 55+ department types: ED, ICU, med-surg, imaging, pharmacy, OR suite, behavioral health, and more.
02 — Cost Estimating
The estimate comes straight from the room program, using the same quantities, unit costs, and line items. You can keep versions to see how costs change from conceptual through construction documents. Mark one as the budget seed and it becomes the project budget when the project moves into execution.
Your own cost history (cost per SF, soft cost percentages, contingency) replaces the national defaults, so estimates reflect what your projects actually cost.
03 — Equipment Planning
Equipment lists are generated room by room from your planning standards, using your GPO contract items, standard quantities, and unit costs. The Equipment tab groups everything by department, with subtotals and a grand total that feeds the FF&E line of the estimate.
04 — Phase Scheduling
The phase schedule is generated from the scope and covers programming, schematic design, design development, construction documents, bidding, construction, and activation, with durations based on the size and complexity of the program. Mark one schedule as the seed and its phases become the top-level milestones in the execution Gantt.
05 — Block Planning
The block plan engine lays rooms out on a floor plate using healthcare corridor patterns and adjacency rules. You can drag rooms around and export the layout as a PNG or DXF for early design conversations, even before an architect is on board.
06 — Export to Revit
Export your space program as an IFC4 file that opens directly in Revit. The design team gets room data, square footages, and department structure as a working model instead of a PDF they have to retype.
Execution & Governance
07 — Governance
Approval levels are set by project cost. When a project's projected cost crosses a threshold, the right approval level kicks in automatically, so nobody has to remember the rules. Reviewers approve or reject with notes, and every decision stays on record. If a cost overrun pushes a project into a higher approval level, Continuum sends an alert right away.
08 — Cash Flow
Cash flow is modeled against the project schedule, so it doesn't go stale every time a milestone moves. You can pick a distribution curve (linear, S-curve, front-loaded, back-loaded, or bell curve). Entering actual spending locks that month, and the remaining forecast spreads across the open months automatically.
09 — Gantt Schedule
The execution Gantt starts from the phase schedule built during planning. Each phase becomes a top-level milestone, dated from the project's target start. From there you add sub-tasks, dependencies, and assignments, and the critical path recalculates with every edit. Milestones, all four dependency types (FS, SS, FF, SF), progress tracking, and baseline comparison are included.
10 — ICRA/PCRA
Enter the construction type and patient risk group, and Continuum suggests the ICRA class from the CDC/FGI matrix and fills in the required precautions. Assessment status, effective dates, and sign-offs are all kept in the project record.
11 — Documents
Upload drawings with sheet numbers, disciplines, and issue dates, and filter by drawings, specs, contracts, submittals, or photos. Files are versioned, kept in private storage that only your organization can reach, and shared through secure, expiring links.
12 — Closeout
Substantial completion, documentation, commissioning, regulatory, financial reconciliation, and activation, all in one checklist. Assign items, track progress, and add your own. When everything's done, mark the project complete.
13 — Embedded AI Agents
Five agents run in the background: Cash Flow Intel, Budget Sentinel, Schedule Watchdog, Contract Guardian, and Governance Patrol. Each one watches for its own kind of risk, like forecast overruns, contingency burn, shrinking float on the critical path, stalled NTPs and change orders, or approvals that have gone quiet. A general assistant sits on top and can answer questions about any project from anywhere in the platform.
Configurable Planning Standards
Continuum uses three layers of standards. FGI minimums are the floor. Your organization's planning standards sit on top of those, and project-specific overrides sit on top of that.
By the time your system builds its fourth ED, what you learned on the first three is already in your Layer 2 standards: room ratios, target square footages, gross factors, and cost per SF from your actual bids. Each project starts from a better place than the last.
See how standards work →Layer 1 — FGI Minimums
Locked. Code minimums that can never be programmed below. Updated with each FGI edition.
Layer 2 — Org Standards
Your organization's preferred room sizes, ratios, gross factors, and cost history. Set once. Applied to every project.
Layer 3 — Project Overrides
Deviations from org standards for this specific project. Flagged visually so planners always know what's non-standard.
No Re-Entry, Ever
When a project moves from planning into execution, everything carries over in one step. Nothing gets rebuilt in another tool.
This only works because planning and execution live in the same system. Most tools only cover one or the other.
From Planning
Into Execution
See Continuum Live
What you'll see
We'll go through the platform one phase at a time (space programming, then cost estimating, then execution and governance) so you see how each piece works without getting a wall of screens all at once.
The continuity, live
You'll see a project move from planning into execution in real time, with the space program feeding the budget and the Gantt. Nothing gets re-entered.